BIM for VR training serious game for management and operation of equipment in electrical power substations of Codensa ENEL with CAVE system.



Proposal for new CAVE system at Pontificia Universidad Javeriana.

Project Coordinator
Project ManagementConstructionFit outOffices


Role: Coordinate the activities of interior architecture, facilities fit out and construction of MEP systems. Support the PM in schedule, budget control, document preparation and bidding processes. Construction progress control using BIM models and software.



Projects:
- Scotiabank Contact Center, Bogota (9000m2) / 2018
- Scotiabank Corporate Offices, Bogota (7000m2) / 2018
- Scotiabank Contact Center, Bogota (9000m2) / 2017


BIM Architect
HousingDesignBIM
Role: Architect in charge of the introduction and implementation of the BIM methodology in all the studio's projects, architectural design, structural and technical coordination.



Projects:
- Torre 97, Offices, Bogota / BIM design and documentation / Coordination
- Le Foret Housing, Cali / BIM documentation
- Bella Suiza 3, Housing, Bogotá / BIM Design
